Fleet Search

Search the fleet registry by drone UID or serial number.

QA Inspections
Inspection · WasteShark Plus — Pre-Ship QA v3

H8N

Failed
  • 01
    Hull seam pressure test (≤ 0.2 bar drop / 10 min)
    PASS
  • 02
    Port + starboard drive motors spin true, no cavitation
    Note: Starboard drive motor cavitating under load — RMA the motor and re-seat coupling before re-test.
    FAIL
  • 03
    Battery pack seats, BMS reports 48V ± 0.5V
    PASS
  • 04
    Skimmer basket latches and releases cleanly
    PASS
  • 05
    Nav beacon + status LEDs functional
    PASS
  • 06
    Firmware version matches release manifest
    PASS